Eagle Rock Trail Improvements

Improving a recreational trail in Terra Linda/Sleepy Hollow

UPDATED: OCTOBER 28, 2022

California Environmental Quality Act

The Marin Open Space District (MCOSD) prepared a draft Initial Study/Mitigated Negative Declaration (IS/MND) for the proposed Memorial Trail Improvement Project. (The trail has since been renamed Eagle Rock Trail.) The IS/MND provides information regarding the setting of the project area, the project description, analysis of potentially significant environmental impacts that could result from implementation of the proposed project, and mitigation measures to reduce potentially significant environmental impacts to a less than significant level.  The Notice of Intent to Adopt a Mitigated Negative Declaration and the draft IS/MND can be accessed using the links provided below.

The public comment period was from June 13, 2022 to July 15, 2022 at 5:00 p.m.  

The MCOSD presented the Memorial Trail IS/MND to its Board of Directors on November 8, 2022 for adoption, along with project approval. All comments received on the IS/MND and MCOSD’s responses were included in the material provided to the Board of Directors for their consideration.