Shade Structure

New shade structure at the bike park picnic plaza.

UPDATED JULY 15, 2020

Project Description

The long-awaited shade structure has been installed at Stafford Lake Bike Park. This new steel structure was oriented and designed specifically to provide maximum shade opportunities in the picnic plaza while working within existing site constraints.

Installation was completed in 2020. During that time, the lower portions of the bike park, including the two pump tracks and picnic area, were closed during construction. Call 415-473-JUMP (5867) for latest bike park closure updates.